SIMIRON MVB, Moisture Vapor Barrier is a 100% solids, two-component, epoxy primer designed for concrete floors with moisture vapor transmission (MVT) problems. This primer is applied directly to concrete, after proper surface preparation, to reduce the adhesion and blister effects of MVT problems. This primer is designed to be used as a moisture vapor barrier under SIMIRON decorative floor coatings along with other flooring systems. Compatible with Simiron U-Tint Custom Color Pigment Packs.
Simiron MVB is resistant to MVT up to 20 lbs. per 1000 Sq. Ft. in 24 hours per ASTM F1869 or 95% relative humidity (RH) per ASTM F2170. This product is also available in two cure speed options.
Type | Interior |
---|---|
Size | Gallon |
Color | Clear |
Coverage | 100 Sq. Ft. per gallon |
Brand | Simiron |
Material | 100% Solids Epoxy |
Manufacturer Code | 40009120 |
Surface Preparation: Concrete and coated concrete surfaces must be sound, clean, dry and free of contaminants such as dirt, dust, grease, oil, silicones and other contaminants that may negatively affect adhesion.
Moisture Vapor Barrier: A suitable moisture barrier must be in place for concrete slabs on-grade. If a moisture barrier is not in place, seasonal variations in ground moisture can cause excessive moisture vapor transmission (MVT) regardless of results measured prior to coating application. 16 mils MVB is resistant to MVT up to 25 lbs. per 1000 Sq. Ft. in 24 hours per ASTM F1869 or 95% RH per ASTM F2170.
Application: 1.5-Gallon Kits of MVB should not be split Nominal 3-gallon units of MVB Fast cannot be split.
New/Bare Concrete: Diamond grind or shotblast to a CSP 3 or greater surface profile, depending on total thickness of system. Refer to SSPC-SP13/NACE 6 or ICRI Technical Guideline No. 310.2. New concrete must be cured a minimum of 28 days and should meet moisture vapor transmission (MVT) and relative humidity (RH) thresholds as described previously in Surface Preparation section.
Previously Coated Surfaces: Clean surface to prevent any contaminants from being spread/redistributed to a greater area being prepared. Completely remove previous coatings, sealers, joint fillers, and patching materials. Diamond grind or shotblast to a CSP-3 or greater surface profile. Refer to SSPC-SP13 / NACE 6 or ICRI Technical Guideline No. 310.2.
Dry Time: Open working time: 25-30 Minutes, Tack free: 6 Hours, Light Foot Traffic: 24 Hours, Full Cure: 5 days, all subject to ideal surface & air temerature with relative humidity of 72°F (25°C) 50% RH. Ideal temerature range for application Air Temp: 45°–95°F, Surface Temp: 45°–95°F, Material to be applied: 60°–85°F. Higher temperatures will shorten the pot-life and open working time with material. Floor temperature must be at least 5 degrees over the current dew point.
Coverage: Mixed MVB is applied at a nominal 16 mils (100 Sq. Ft. per gallon). A 1.5-Gallon Kit covers 150 Sq. Ft. and a 3-gallon mix covers 300 Sq. Ft. A 2.86-gallon mix of MVB Fast also covers 300 Sq. Ft. per gallon
Clean Up: Clean up mixing and application equipment immediately after use with acetone or xylene; do not use alcohol. Follow solvent manufacturer’s safety instructions. Be sure to follow all local, state and federal regulations when disposing of materials.